The Beverly branch of the Rock Island Metra line will be shut down starting at 7 pm on Fri 8/22 (projected to continue through Sun 8/24) to replace the Morgan St bridge. They will make more stops on the main line.
Here's a link to a Metra page with more info.
new bridge deck being built

No comments:
Post a Comment